Contact Us Rental Info Location Photo Gallery Grail Dancer Story
Page 1  |  Page 2  |  Page 3  |  Page 4

Decks are on with cabin openings ready.

The decks have been laid and the cabin trunks are going up.

Steve, Raffles, Peter and Wayne installing the Iron Mains'l.

The main cabin top is framed in.

Maureen and Diane beautifying the nearly completed cabins.

Interior of Bow with framing details.

The forward sections inside, showing stringers, ceiling and bulkhead framing.

The fir hanging knees which were cut from grown root structures dug out of clearing piles just before burning.

Page 1  |  Page 2  |  Page 3  |  Page 4

Designed by Senti